— Est. 2012 — Nairobi, Kenya

Two capabilities.

One contract.

No schedule revisions.

Euro Savannah Construction has operated across Kenya's roads and building sectors since 2012. Roads, structures, and prefab deployments — all under a single accountable team.

/ Operational since 2012

Built from the ground up in Kenya

12+ years active delivery

Continuous operations from 2012 through present, spanning road infrastructure, commercial builds, and modular structures.

6 counties, multiple contract types

Government, private developer, and NGO contracts across Nairobi, Machakos, Meru, Kisumu, Nakuru, and Kajiado counties.

Founded in Nairobi, Euro Savannah began with road rehabilitation contracts in Central and Eastern Kenya. Over twelve years, the firm expanded its scope to commercial buildings and prefab deployments across six counties.

Zero revised handover dates

The schedule signed at contract award is the schedule at handover. No amended programmes, no extended milestones.

Every contract since the first has closed on the original handover date. That record is not a claim — it is the condition under which we take on new work.

Wide-angle shot from ground level, a grader machine mid-operation on a red-murram road cutting through dry Kenyan savannah, dust rising in strong midday sun, road extending toward a low horizon with acacia trees at the edge of frame
Wide-angle shot from ground level, a grader machine mid-operation on a red-murram road cutting through dry Kenyan savannah, dust rising in strong midday sun, road extending toward a low horizon with acacia trees at the edge of frame
+ Dual-capability firm

Roads and structures under one contract

Road infrastructure — highways, murram roads, drainage works — and building construction handled by the same team. No coordination gap between contractors, no delay transfer between scopes.

Prefab modular units compress deployment timelines by 40–60%. The unit is fabricated to specification while site preparation runs in parallel — not in sequence.

The record speaks before we do

Completed roads, installed prefab units, and handed-over structures across Kenya. The portfolio carries the evidence procurement committees need.